About Us

Established in 2011, LOSBEL is involved in the planning, design, manufacture, installation and construction of custom wastewater treatment systems (this includes all the land planning works, any cement work as well as the construction of the service facility). We also produce a variety of pump stations and are happy to complete all the range of works relating to sanitation. within LOSBEL, we have a dedicated service team that provides round-the-clock support, guarantee and, non-guarantee works of both industrial and private home systems. A solid base of industry knowledge and the vast experience of our engineers allows us to be at the top of the market and offer our clients innovative to treat wastewater.
Download company details

Our history

2019
Berezino Wastewater Treatment Facilities Opening
On the 24th of March in Berezino we hosted the opening ceremony to mark the launch of our wastewater treatment facilities with a total power of 4980 cubic metres per day. Alexander Terehov, the Minister of the Housing, was present at the ceremony along with the chairman of the regional executive committee, Alexander Babichev. Also invited were several directors and technical experts from the department of water utilities of Belarus and neighboring countries. The ceremony was held in conjunction with a board meeting of the department of water utilities.
Read more
2018
The construction of a sewage treatment plant of 9,300 cubic meters per day has been completed in Rogachev
In December of 2018, the construction of a sewage treatment plant in Rogachev was completed. All equipment is installed and ready for commissioning. The capacity of the structures is 9,300 cubic meters per day. The construction was carried out by LOSBEL together with Pinskhovkhozstroy.
Read more

We offer up-to-date production, qualified specialists and top of the range European technology to provide the full cycle of works from production to service for a competitive price. Within our own corporation, we have integrated the quality control system ISO 9001 and warehouse supplies of equipment allow us to fabricate equipment in the shortest of periods.

Every client and every enquiry is important to us and we try to respond within 24 hours. Any project begins with a thorough procedure of data collection and analysis after which our engineers begin to select equipment based on the received results. If required, we also offer a complete pack of project documentation, developed by our planning department. The next stage is to fabricate the wastewater treatment plant in-house. Prior to dispatch of any parts to the client, all equipment is rigorously tested to meet the highest industry standards.

Wide ranges of manufactured products allows us to deliver a complete framework of equipment including in-take and out-take ports of water, which makes life easier for our clients – no more searching high and low for different suppliers! We guarantee, that all equipment produced by LOSBEL works in sync and can be delivered on-site as a single module rather than piece-by-piece.

IN-HOUSE PRODUCTION
We offer state of the art production, highly qualified specialists and top of the range European technology to provide the full cycle of work from production to service for a competitive price. Within our own corporation, we have integrated the quality control system ‘ISO 9001’ and having our own supply warehouse allows us to fabricate equipment in the shortest of periods.

Currently our product range includes
A COMPLEX APPROACH
Wide ranges of manufactured products allows us to deliver a complete framework of equipment including in-take and out-take ports of water, which makes life easier for our clients – no more searching high and low for different suppliers! We guarantee, that all equipment produced by LOSBEL works in sync and can be delivered on-site as a single module rather than piece-by-piece.
Book your free consultation

Please leave your contact details to receive your free consultation

10,000 cubic meters per day is the capacity of the largest facility which is in the process of completion
200+ facilities without a central sewage system, our modular treatment facilities have been installed
500+ individuals purchase our treatment facilities for their private homes every year
6 months on average, is the time it takes to complete the construction of a sewage treatment plant
from 0.2 to 0.5 kW * h make up the cost of electricity for cleaning 1 cubic meter. water
More than 50,000 cubic meters of wastewater is cleaned daily by our treatment facilities
Advantages of our equipment
Full cycle service
Garantees
Simple construction
Own production
No stirrers
Customer
reviews

Need advice?

Please leave your contact details
to receive your free consultation